CCR Rule Compliance Data and Information

View all documents or choose from the dropdown lists below.

Document Title Company Station CCR Unit Document Type
Iatan Station Notification of Intent to Close - Final Kansas City Power & Light Company Iatan Generating Station Ash Impoundment Closure and Post-closure Care
Iatan Ash Imp IDF Control Plan 4-16-2018 Kansas City Power & Light Company Iatan Generating Station Ash Impoundment Operating Criteria
Iatan Ash Imp Closure Plan_4-16-2018 Kansas City Power & Light Company Iatan Generating Station Ash Impoundment Closure and Post-closure Care
Sibley Slag Imp 2017 GW Annual Report 1-30-2018 KCP&L Greater Missouri Operations Company Sibley Generating Station Slag Impoundment Groundwater Monitoring and Corrective Action
Sibley Fly Ash Imp 2017 GW Annual Report 1-30-2018 KCP&L Greater Missouri Operations Company Sibley Generating Station Fly Ash Impoundment Groundwater Monitoring and Corrective Action
Sibley CCR LF 2017 GW Annual Report 1-30-2018 Rev1 KCP&L Greater Missouri Operations Company Sibley Generating Station CCR Landfill Groundwater Monitoring and Corrective Action
Montrose N and S Ash Imp 2017 GW Annual Report 1-30-2018 Kansas City Power & Light Company Montrose Generating Station South Ash Impoundment Groundwater Monitoring and Corrective Action
Montrose N and S Ash Imp 2017 GW Annual Report 1-30-2018 Kansas City Power & Light Company Montrose Generating Station North Ash Impoundment Groundwater Monitoring and Corrective Action
Montrose CCR LF 2017 GW Annual Report 1-30-2018 Kansas City Power & Light Company Montrose Generating Station CCR Landfill Groundwater Monitoring and Corrective Action
LaCygne Upper AQC 2017 GW Annual Report 1-30-2018 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Groundwater Monitoring and Corrective Action
LaCygne LF-LAQC 2017 GW Annual Report 1-30-2018 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Groundwater Monitoring and Corrective Action
LaCygne LF-LAQC 2017 GW Annual Report 1-30-2018 Kansas City Power & Light Company La Cygne Generating Station CCR Landfill Groundwater Monitoring and Corrective Action
Iatan CCR LF 2017 GW Annual Report 1-30-18 Rev1 Kansas City Power & Light Company Iatan Generating Station CCR Landfill Groundwater Monitoring and Corrective Action
LaCygne Bot Ash Imp 2017 GW Annual Report 1-30-2018 Kansas City Power & Light Company La Cygne Generating Station Bottom Ash Impoundment Groundwater Monitoring and Corrective Action
Iatan-Landfill-GW-MonSys-Cert-10-12-2017 Kansas City Power & Light Company Iatan Generating Station CCR Landfill Groundwater Monitoring and Corrective Action
Iatan-Landfill-StatMethod-Cert-10-12-2017 Kansas City Power & Light Company Iatan Generating Station CCR Landfill Groundwater Monitoring and Corrective Action
LaCygne-BotAsh-StatMethod-Cert-10-11-2017 Kansas City Power & Light Company La Cygne Generating Station Bottom Ash Impoundment Groundwater Monitoring and Corrective Action
La-Cygne-BAsh-GW-Mon-Sys-Cert--10-11-2017 Kansas City Power & Light Company La Cygne Generating Station Bottom Ash Impoundment Groundwater Monitoring and Corrective Action
La-Cygne-LF-LAQC-GW-Mon-Sys-Cert--10-11-2017 Kansas City Power & Light Company La Cygne Generating Station CCR Landfill Groundwater Monitoring and Corrective Action
La-Cygne-LF-LAQC-GW-Mon-Sys-Cert--10-11-2017 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Groundwater Monitoring and Corrective Action
LaCygne-LF-LAQC-Stat-Cert-10-11-2017 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Groundwater Monitoring and Corrective Action
LaCygne-LF-LAQC-Stat-Cert-10-11-2017 Kansas City Power & Light Company La Cygne Generating Station CCR Landfill Groundwater Monitoring and Corrective Action
La-Cygne-UAQC-StatMethod-Cert-10-11-2017 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Groundwater Monitoring and Corrective Action
La-Cygne-UAQC-GW-Mon-Sys-Cert-10-11-2017 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Groundwater Monitoring and Corrective Action
Sibley-FlyAsh-Imp-GW-MonSys-Cert-10-12-2017 KCP&L Greater Missouri Operations Company Sibley Generating Station Fly Ash Impoundment Groundwater Monitoring and Corrective Action
Sibley-FlyAshImp-StatMethod-Cert--10-12-2017 KCP&L Greater Missouri Operations Company Sibley Generating Station Fly Ash Impoundment Groundwater Monitoring and Corrective Action
Sibley-Landfill-StatMethod-Cert-10-12-2017 KCP&L Greater Missouri Operations Company Sibley Generating Station CCR Landfill Groundwater Monitoring and Corrective Action
Sibley-Landfill-GW-Mon-Sys-Cert-10-12-2017 KCP&L Greater Missouri Operations Company Sibley Generating Station CCR Landfill Groundwater Monitoring and Corrective Action
Sibley-Slag-Imp-GW-MonSys-Cert-10-12-2017 KCP&L Greater Missouri Operations Company Sibley Generating Station Slag Impoundment Groundwater Monitoring and Corrective Action
Sibley-SlagImp-StatMethod-Cert-10-12-2017 KCP&L Greater Missouri Operations Company Sibley Generating Station Slag Impoundment Groundwater Monitoring and Corrective Action
Mont-Landfill-StatMethod-Cert-10-12-2017 Kansas City Power & Light Company Montrose Generating Station CCR Landfill Groundwater Monitoring and Corrective Action
Mont-LF-GW-Mon-Sys-Cert-10-12-2017 Kansas City Power & Light Company Montrose Generating Station CCR Landfill Groundwater Monitoring and Corrective Action
MontNS-Ash-GWMonSys-Cert-10-12-2017 Kansas City Power & Light Company Montrose Generating Station South Ash Impoundment Groundwater Monitoring and Corrective Action
MontNS-Ash-GWMonSys-Cert-10-12-2017 Kansas City Power & Light Company Montrose Generating Station North Ash Impoundment Groundwater Monitoring and Corrective Action
MontNS-Ash-StatMethod-Cert-10-12-2017 Kansas City Power & Light Company Montrose Generating Station South Ash Impoundment Groundwater Monitoring and Corrective Action
MontNS-Ash-StatMethod-Cert-10-12-2017 Kansas City Power & Light Company Montrose Generating Station North Ash Impoundment Groundwater Monitoring and Corrective Action
La-Cygne-Upper-AQC-Imp-2016-Annual-CCR-Inspection-Report_01-06-2017 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Operating Criteria
La-Cygne-Upper-AQC-Imp-IDF-Control-Plan-10-13-2016 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Operating Criteria
2017-La-Cygne-Upper-AQC-Imp-Annual-Inspection-Report-01-09-18 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Operating Criteria
LaCygneAnnualCCRInspectionReport_UpperAQC_2015 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Operating Criteria
La-Cygne-Lower-AQC-Imp-2016-Annual-CCR-Inspection-Report_01-06-2017 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Operating Criteria
La-Cygne-Lower-AQC-Imp-IDF-Control-Plan-10-13-2016 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Operating Criteria
2017-La-Cygne-Lower-AQC-Imp-Annual-Inspection-Report-01-09-18 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Operating Criteria
LaCygneAnnualCCRInspectionReport_LowerAQC_2015 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Operating Criteria
2017-Sibley-Fly-Ash-Imp-Annual-CCR-Inspection-Report-01-09-18 KCP&L Greater Missouri Operations Company Sibley Generating Station Fly Ash Impoundment Operating Criteria
Sibley-Fly-Ash-Imp-IDF-Control-Plan-10-13-2016 KCP&L Greater Missouri Operations Company Sibley Generating Station Fly Ash Impoundment Operating Criteria
Sibley Fly Ash Imp 2016 Annual CCR Inspection Report_01-06-2017 KCP&L Greater Missouri Operations Company Sibley Generating Station Fly Ash Impoundment Operating Criteria
SibleyAnnualCCRInspectionReport_FlyAsh_2015 KCP&L Greater Missouri Operations Company Sibley Generating Station Fly Ash Impoundment Operating Criteria
2017-Sibley-CCR-Landfill-Annual-CCR-Inspection-Report-01-09-18 KCP&L Greater Missouri Operations Company Sibley Generating Station CCR Landfill Operating Criteria
2017-Montrose-CCR-Landfill-Annual-Inspection-Report--01-09-18 Kansas City Power & Light Company Montrose Generating Station CCR Landfill Operating Criteria
2017-La-Cygne-CCR-Landfill-Annual-Inspection-Report-01-09-18 Kansas City Power & Light Company La Cygne Generating Station CCR Landfill Operating Criteria
2017-Iatan-CCR-Landfill-Annual-Inspection-Report-01-09-18 Kansas City Power & Light Company Iatan Generating Station CCR Landfill Operating Criteria
Iatan-2017-CCR-Fugitive-Dust-Control-Report_12-19-2017 Kansas City Power & Light Company Iatan Generating Station All Facility CCR Units All Facility CCR Units
Iatan-CCR-Fugitive-Dust-Control-Report-12-19-2016 Kansas City Power & Light Company Iatan Generating Station All Facility CCR Units All Facility CCR Units
Sibley-2017-CCR-Fugitive-Dust-Control-Report-Final_12-19-2017 KCP&L Greater Missouri Operations Company Sibley Generating Station All Facility CCR Units All Facility CCR Units
Sibley-CCR-Fugitive-Dust-Control-Report-12-19-2016 KCP&L Greater Missouri Operations Company Sibley Generating Station All Facility CCR Units All Facility CCR Units
Montrose-2017-CCR-Fugitive-Dust-Control-Report-Final_12-19-2017 Kansas City Power & Light Company Montrose Generating Station All Facility CCR Units All Facility CCR Units
Montrose-CCR-Fugitive-Dust-Control-Report-12-19-2016 Kansas City Power & Light Company Montrose Generating Station All Facility CCR Units All Facility CCR Units
La-Cygne-2017-CCR-Fugitive-Dust-Control-Report-Final_12-19-2017 Kansas City Power & Light Company La Cygne Generating Station All Facility CCR Units All Facility CCR Units
La-Cygne-CCR-Fugitive-Dust-Control-Report-12-19-16-2016 Kansas City Power & Light Company La Cygne Generating Station All Facility CCR Units All Facility CCR Units
La Cygne Dust Control Plan Rev 1_5-3-2017 Kansas City Power & Light Company La Cygne Generating Station All Facility CCR Units All Facility CCR Units
Sibley Dust Control Plan 10-19-2015 KCP&L Greater Missouri Operations Company Sibley Generating Station All Facility CCR Units All Facility CCR Units
Montrose Dust Control Plan 10-08-2015 Kansas City Power & Light Company Montrose Generating Station All Facility CCR Units All Facility CCR Units
Iatan Dust Control Plan Final Rev 1_4-18-2017 Kansas City Power & Light Company Iatan Generating Station All Facility CCR Units All Facility CCR Units
MontroseAnnualCCRInspectionReport_Landfill_2015 Kansas City Power & Light Company Montrose Generating Station CCR Landfill Operating Criteria
SibleyAnnualCCRInspectionReport_Landfill_2015 KCP&L Greater Missouri Operations Company Sibley Generating Station CCR Landfill Operating Criteria
LaCygneAnnualCCRInspectionReport_Landfill_2015 Kansas City Power & Light Company La Cygne Generating Station CCR Landfill Operating Criteria
Iatan-Landfill-Closure-Plan_10-14-2016 Kansas City Power & Light Company Iatan Generating Station CCR Landfill Closure and Post-closure Care
Sibley-Landfill-Run-On-Run-Off-Control-Sys-Plan_10-17-2016 KCP&L Greater Missouri Operations Company Sibley Generating Station CCR Landfill Operating Criteria
Sibley-Landfill-2016-Annual-CCR-Inspection-Report_1-06-2017 KCP&L Greater Missouri Operations Company Sibley Generating Station CCR Landfill Operating Criteria
Sibley-Landfill-Post-Closure-Plan_10-13-2016 KCP&L Greater Missouri Operations Company Sibley Generating Station CCR Landfill Closure and Post-closure Care
Sibley-Landfill-Closure-Plan_10-14-2016 KCP&L Greater Missouri Operations Company Sibley Generating Station CCR Landfill Closure and Post-closure Care
Sibley-Slag-Settling-Imp-IDF-Control-Plan-10-13-2016 KCP&L Greater Missouri Operations Company Sibley Generating Station Slag Impoundment Operating Criteria
Sibley-Slag-Imp-Closure-Plan_10-1-2016 KCP&L Greater Missouri Operations Company Sibley Generating Station Slag Impoundment Closure and Post-closure Care
Sibley-Fly-Ash-Imp-Structural-Stability-Report-10-11-2016 KCP&L Greater Missouri Operations Company Sibley Generating Station Fly Ash Impoundment Design Criteria
Sibley-Fly-Ash-Imp-Safety-Factor-Report-10-11-2016 KCP&L Greater Missouri Operations Company Sibley Generating Station Fly Ash Impoundment Design Criteria
Sibley-Fly-Ash-Imp-History-of-Construction-Report-10-6-2016 KCP&L Greater Missouri Operations Company Sibley Generating Station Fly Ash Impoundment Design Criteria
Sibley-Fly-Ash-Imp-Hazard-Potential-Report-10-7-2016 KCP&L Greater Missouri Operations Company Sibley Generating Station Fly Ash Impoundment Design Criteria
Sibley-Fly-Ash-Imp-Closure-Plan_10-14-2016 KCP&L Greater Missouri Operations Company Sibley Generating Station Fly Ash Impoundment Closure and Post-closure Care
Montrose-N-Fly-Ash-Imp-IDF-Control-Plan-10-13-2016 Kansas City Power & Light Company Montrose Generating Station North Ash Impoundment Operating Criteria
Closure-Plan-Montrose-North-Ash-Imp-Final-Rev_0-10-14-16 Kansas City Power & Light Company Montrose Generating Station North Ash Impoundment Closure and Post-closure Care
Montrose-S-Fly-Ash-Imp-IDF-Control-Plan-10-13-2016 Kansas City Power & Light Company Montrose Generating Station South Ash Impoundment Operating Criteria
Closure-Plan-Montrose-South-Ash-Imp-Final_10-14-16 Kansas City Power & Light Company Montrose Generating Station South Ash Impoundment Closure and Post-closure Care
Montrose-Landfill-Run-On-Run-Off-Control-Sys-Plan_10-17-2016 Kansas City Power & Light Company Montrose Generating Station CCR Landfill Operating Criteria
Montrose-Landfill-2016-Annual-CCR-Inspection-Report_01-06-2017 Kansas City Power & Light Company Montrose Generating Station CCR Landfill Operating Criteria
Montrose-Landfill-Post-Closure-Plan_10-13-2016 Kansas City Power & Light Company Montrose Generating Station CCR Landfill Closure and Post-closure Care
Montrose-Landfill-Closure-Plan-_10-14-2016 Kansas City Power & Light Company Montrose Generating Station CCR Landfill Closure and Post-closure Care
La-Cygne-Bot-Ash-Imp-Closure-Plan_10-14-2016 Kansas City Power & Light Company La Cygne Generating Station Bottom Ash Impoundment Closure and Post-closure Care
La-Cygne-Lower-AQC-Imp-Structural-Stability-Report-10-11-2016 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Design Criteria
La-Cygne-Lower-AQC-Imp-Safety-Factor-Report-10-11-2016 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Design Criteria
La-Cygne-Lower-AQC-Imp-History-of-Construction-Report-10-6-2016 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Design Criteria
La-Cygne-Lower-AQC-Imp-Hazard-Potential-Report-10-7-2016 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Design Criteria
La-Cygne-Lower-AQC-Imp-Post-Closure-Plan_10-13-2016 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Closure and Post-closure Care
La-Cygne-Lower-AQC-Imp-Closure-Plan-10-14-2016 Kansas City Power & Light Company La Cygne Generating Station Lower AQC Impoundment Closure and Post-closure Care
La-Cygne-Upper-AQC-Imp-Structural-Stability-Report-10-11-2016 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Design Criteria
La-Cygne-Upper-AQC-Imp-Safety-Factor-Report-10-11-2016 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Design Criteria
La-Cygne-Upper-AQC-Imp-History-of-Construction-Report-10-6-2016 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Design Criteria
La-Cygne-Upper-AQC-Imp-Hazard-Potential-Report-10-7-2016 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Design Criteria
La-Cygne-Upper-AQC-Im-Closure-Plan-10-14-2016 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Closure and Post-closure Care
La-Cygne-Upper-AQC-Imp-Post-Closure-Plan_10-13-2016 Kansas City Power & Light Company La Cygne Generating Station Upper AQC Impoundment Closure and Post-closure Care
La-Cygne-CCR-Landfill-Run-On-Run-Off-Control-Plan-10-17-2016 Kansas City Power & Light Company La Cygne Generating Station CCR Landfill Operating Criteria
La-Cygne-Landfill-2016-Annual-CCR-Inspection-Report_01-06-2017 Kansas City Power & Light Company La Cygne Generating Station CCR Landfill Operating Criteria
La-Cygne-Landfill-Post-Closure-Plan_10-13-2016 Kansas City Power & Light Company La Cygne Generating Station CCR Landfill Closure and Post-closure Care
La-Cygne-Landfill-Closure-Plan-10-14-2016 Kansas City Power & Light Company La Cygne Generating Station CCR Landfill Closure and Post-closure Care
La-Cygne-Bottom-Ash-Imp-IDF-Control-Plan-10-13-2016 Kansas City Power & Light Company La Cygne Generating Station Bottom Ash Impoundment Operating Criteria
Iatan-Landfill-Post-Closure-Plan_10-13-2016 Kansas City Power & Light Company Iatan Generating Station CCR Landfill Closure and Post-closure Care
Iatan-Landfill-2016-Annual-CCR-Inspection-Report_01-06-2017 Kansas City Power & Light Company Iatan Generating Station CCR Landfill Operating Criteria
Iatan-Landfill-Run-On-Run-Off-Control-Sys-Plan_10-17-2016 Kansas City Power & Light Company Iatan Generating Station CCR Landfill Operating Criteria
IatanAnnualCCRInspectionReport_Landfill_2015 Kansas City Power & Light Company Iatan Generating Station CCR Landfill Operating Criteria